Shift is Submitted

Submitted at 02-03-2025 · 07:15
Last edited by Tom Wilson at 02-03-2025 · 06:45

1. What are the shift timings?

Start Time
01-03-2025 21:00
Shift Duration
9 Hours 0 Minutes
End Time
02-03-2025 06:00
Access Point
Ruislip
Meeting Point
West Compound

Temperature
6 °C
Weather Conditions
Overcast
Wind
Light breeze

2. Access Information

Planned vs Actual times with variance tracking

Event Planned Actual Variance
On Track Equipment 01-03 22:25 01-03 22:25 On time
Works Commence 01-03 23:00 01-03 23:30 +30 min
Works Complete 02-03 04:00 02-03 04:00 On time
Off Track Equipment 02-03 04:10 02-03 04:40 +30 min
Isolation Permit Handback 02-03 04:15 02-03 04:50 +35 min

Reason for variance: Delay at RRAP

3. Resource Information

People

Name Role Type Supplier Start Time
Hartley Dean COSS Amco Giffen 01-03 21:00
Danny Brown Foreman Amco Giffen 01-03 21:00
Mark Neilson Groundworker Story Contracting 01-03 21:00
Nicky Skinner Engineer Colas Rail 01-03 21:00

Equipment

Supplier Type Qty
A-Plant Backhoe 1
A-Plant Compactor 1
Hawk Plant Hire Bulldozer 1

4. Worklog

Activities, quantities, and events

Location Activity Planned Actual Unit
CH1/235 Cable Containment Install... 60 30 Metre

Discipline: HV Works

Variance Category: Late Access

Reason for variance: Excavation had an unexpected live cable in it. Had to stop work.

Event · 02-03-2025 01:19
A site inspection was carried out to assess the condition of the existing troughing. Observations noted areas of wear and degradation that could impact the stability of the new cable containment installation.

5. Shift Comments

During the shift, the team was engaged in the cable containment installation (C19) at location CH1/235 under HV works. The planned scope was to complete 60 metres of installation. However, progress was halted after 30 metres due to the discovery of an unexpected live cable within the excavation area. For safety reasons, work was immediately stopped to prevent any hazards. The variance falls under 'Unexpected Physical Conditions.' Further assessment is required before resuming activities to ensure safe continuation of works.

01-03-2025 22:00 ✓
Health & Safety Issues: No Health & Safety Issues added.

Delivery Notes

Date Received By Supplier PO No.
01-03-2025 21:00 Tom Wilson A1 Aggregates PO-78432
01-03-2025 21:00 Tom Wilson Jewson PO-78451

6. Hours Allocation

Allocate hours for each resource

Name Role Hours
Hartley Dean COSS 9
Danny Brown Foreman 9
Mark Neilson Groundworker 9
Nicky Skinner Engineer 9

Allocate Hours - Hartley Dean

Total 9.00 hours

Allocated 5.00 hours
Remaining 4.00 hours

Worklog Activities

  • CH1/235 - Cable Install C19: −4+
  • CH1/237 - Cable Install C43: −1+
  • Break Time: −1+
  • Non-Productive Time: 3.00 hours

What a shift record looks like

8 steps. Under 5 minutes. Up to 64% pre-filled from yesterday's data, your programme, and weather APIs.

Shift Information

Date & Time
15-01-2026 • 07:00 AM
Shift Duration
10h 30m
Weather Conditions
Temperature
8°C
Conditions
Overcast

Confirm People

Pre-Filled
The team is pre-loaded. Tap +/- to adjust headcount.

Confirm Equipment

Pre-Filled
Equipment list planned from hire schedules. Enter hours worked. Flag any standing time.

Log progress

Activities from your WBS. Enter quantities completed.

Activity Planned Actual
Sheet Piling 100 75
Rebar Installation 100 100
Concrete Pour 40 50

Record events & delays

Description Time Duration
DELAY EVENT - Sheet piling halted due to unexpected ground obstruction at 4.2m depth. Awaiting geotechnical assessment. 15-01-2026 • 09:45 2h 30m

Add photos

Photos that stand up as evidence in disputes.

Allocate resources

Structure Activity
Structure 1S/FQ - Sheet Piling Civil Engineering
Adam Barnes Electrician • AMCO
Sarah Mitchell Site Engineer • Kier

Review & submit

Quick summary of everything captured.

Commercial Intelligence

Don't let value leak through the cracks.

Compensation events start as small site instructions or minor delays. Gather captures these triggers digitally at the source, ensuring you have the evidence to get paid.